DFZ2407/DFZ2406 are working hard on the grades between Eradu & Northern Gully with a loaded iron ore on 8 March 2009. 1024x646 8March09_DFZ2407_DFZ2406__Wicherina.JPG Buy Print |
DFZ2407/DFZ2406 are working hard on the grades between Eradu & Northern Gully with a loaded iron ore on 8 March 2009. 1024x683 8March09_DFZ2407_DFZ2406_Wicherina.JPG Buy Print |
ZB2125 on a ballast train leaves Northern Gully on 8 March 2009. 1024x683 8Mar09_ZB2125_NorthernGully.JPG Buy Print |
ZB2125 shunts ballast wagons at Northern Gully on 8 March 2009. 1024x683 8Mar09_ZB2125Northern_Gully.JPG Buy Print |
ZB2125 shunts ballast wagons at Northern Gully on 8 March 2009. 1024x683 8Mar09_ZB2125NorthernGully.JPG Buy Print |
P2505 is about to pass DFZ2406/ DFZ2407 on their respective iron ore trains on 8 March 2009 at Northern Gully. 1024x672 8Mar09_P2505_DFZ2406_DFZ2407_NorthernGully.JPG Buy Print |
P2505/DFZ2404 haul a loaded iron ore west of Eradu heading for Geraldton Port on 8 March 2009. 1024x683 8Mar09_P2505_DFZ2404_Wicherina.JPG Buy Print |
DFZ2404 and DFZ2406 pass each other on their respective ore train at Northern Gully on 8 March 2009 1024x683 8Mar09_DFZ2406_DFZ2404_NorthernGully.JPG Buy Print |
DFZ2404 and DFZ2407 pass each other on their respective ore train at Northern Gully on 8 March 2009. 1024x683 8Mar09_DFZ2404_DFZ2407_NorthernGully.JPG Buy Print |
DFZ2401/DFZ2407on 1712 empty iron ore to Ruvidini on 22 March 2009. 1024x683 22March09_DFZ2401_DFZ2407_Moonyoonooka.JPG Buy Print |
ZB2125 backs down to the ballasting site south of Bowgada on 22 March 2009. 1024x683 22Mar09_ZB2125_Bowgada_.JPG |
A changed Perenjori with blue netal ballast on 22 March 2009. 1024x683 22Mar09_Perenjori.JPG Buy Print |
DFZ2401/DFZ2407on 1712 empty iron ore to Ruvidini crossing DFZ2406/ DFZ2404 on 1711 loaded iron ore on 22 March 2009. 1024x683 22Mar09_DFZ2406_DFZ2404_DFZ2401_DFZ2407_NorthernGully.JPG Buy Print |
With a new roof really enhancing the historic Walkaway Station P2510/P2515 pass on a loaded grain train to Geraldton Port on 21 March 2009. 1024x683 21Mar09_P2510_P2515Walkaway.JPG Buy Print |
The all ARG liveried pair of P2510/P2515 on a loaded grain train to Geraldton Port through Georgina on 21 March 2009. 1024x683 21Mar09_P2510_P2515Georgina.JPG Buy Print |
DFZ2407/DFZ2401 on a loaded iron ore pass the earthworks for Stage Two of the Geraldton Southern Transport Corridor this time the road component on 21 March 2009. 1024x683 21Mar09_DFZ2407_DFZ2401_MtTarcoola.JPG Buy Print |
DFZ2417/DFZ2407 haul a loaded iron ore train near Grants on the Mullewa line on 21 March 2009. 1024x683 21Mar09_DFZ2407_DFZ2401_Grants.JPG Buy Print |
DFZ2401 the latest DFZ to be outshopped and the ex QR 2356 sits at Geraldton Port on 21 March 2009. 1024x670 21Mar09_DFZ2401_GeraldtonPort.JPG Buy Print |
DFZ2401/DFZ2407 are crossed by P2510/P2515 at GeraldtonPort on 21 March 2009. 1024x683 21Mar09_DFZ2401_DFZ2407_P2510_P2515_GeraldtonPort.JPG Buy Print |
Fog! in Geraldton, P2505/DFZ2404 sit on an iron ore train at Narngulu on 16 March 2009. 1024x683 16Mar2009_P2505_DFZ2404_Narngulu.JPG Buy Print |
ZB2125 powers up at Kojarena on 8 March 2009. 1024x656 ZB2125_Kojarena8Mar2009.JPG Buy Print |
ZB2125 on full zoom at Kojarena on 8 March 2009. 1024x652 ZB2125_Kojarena8Mar09.JPG Buy Print |
ZB2125 arrives at Narngulu on 7 March 2009. 1024x683 ZB2125Narngulu7Mar09.JPG Buy Print |
A line of EX QR wagons VAOG type stored for several months at Narngulu are seen on 7 March 2009. A week later they went to Perth. 1024x683 VAOG_Narngulu7Mar09.JPG Buy Print |
P2510 on the empty coal train crosses ZB2125 on a ballast train at Walkaway on 7 March 2009. 1024x665 P2510_ZB2125_Narngulu7Mar09.JPG Buy Print |
P2510/ DFZ2401 arrive into Narngulu yard on 17 March 2009. This was DFZ2401's delivery trip to Narngulu, DFZ2401 is ex QR 2356. 1024x683 P2510_DFZ2401_Narngulu17Mar09.JPG Buy Print |
P2508 on a loaded coal train at Narngulu on 15 March 2009. P2508 had not been seen in this area for several years. 1024x683 P2508_Narngulu15Mar09.JPG Buy Print |
P2505/ DFZ2404 on a loaded iron ore cross ZB2125 on a ballast train at Narngulu on 8 March 2009. DFZ2404 is ex QR 2370 whilst ZB2125 is ex QR 2359. 1024x683 P2505_DFZ2404_ZB2125_Narngulu8March09.JPG.jpg Buy Print |
Something not seen in Geraldton a train in fog, P2505/DFZ2404 sit at Narngulu on a loaded iron ore train on 16 March 2009. 1024x683 P2505_DFZ2404_Narngulu16Mar2009.JPG Buy Print |
P2503/ P2509 head south out of Narngulu on 13Febuary 2009 with an empty grain train. 1024x683 P2503_P2509Narngulu13Feb09.JPG Buy Print |
DFZ2407/P2515 on an empty iron ore through Kojarena on 14Febuary 2009. 1024x683 DFZ2407_P2515_Kojarena14Feb09.JPG Buy Print |
DFZ2407/DFZ2406 haul a loaded iron ore train through Wicherina on 8 March 2009. AThe front portion of the train is part of the next batch of AHCF wagons that had arrived at that time. 1024x683 DFZ2407_DFZ2406_Wicherina8March09.JPG Buy Print |
DFZ2406/DFZ2407 climb into Northern Gully on an empty iron ore on 8 March 2009. New AHCF wagons can be seen on the back of the train. 1024x683 DFZ2406_DFZ2407_NorthernGully8Mar09.JPG Buy Print |
DFZ2406/DFZ2407 on an empty iron ore at Bringo on 21 Febuary 2009. 1024x683 DFZ2406_DFZ2407_Bringo21Feb09.JPG Buy Print |
DFZ2406/ DFZ2404 on a loaded iron ore are crossed by DFZ2407/P2515 at NorthernGully on 14Febuary 2009. 1024x683 DFZ2406_DFZ2404_DFZ2407_P2515NorthernGully14Feb09.JPG Buy Print |
DFZ2404 on one iron ore and DFZ2407 on another coss at Northern Gully on 8 March 2009. 1024x683 DFZ2404_DFZ2407_NorthernGully8March09.JPG Buy Print |
Newly rebuilt DFZ2401 is seen paired with DFZ2407 at Geraldton Port whilst unloading an iron ore train on 21 March 2009. 1024x683 DFZ2401_DFZ2407_GeraldtonPort21Mar09.JPG Buy Print |
The latest batch of AHCF wagons sit at Narngulu on 20 March 2009 (arrived 17 & 18 March 2009). 1024x683 AHCF_Narngulu20Mar09.JPG Buy Print |
AHCF Wagons prior to entering service at Narngulu on 15 February 2009. 1024x683 AHCF_Narngulu15Feb09.JPG Buy Print |
CIMC Australia "Builders Plate" on the AHCF wagons at Northern Gully on 14 February 2009. 1024x624 AHCF_CIMC_NorthernGully14Feb09.JPG Buy Print |
A blast from the past A1513/P head through Younanning on 6 April 2004. 1024x767 Whereisit.JPG Buy Print |
AHCF 27038Y is transported from Geraldton Port along WillcockDve in Geraldton on 9 February 2009. 1024x658 9Feb09_AHCF_27038Y_WillcockDve_Geraldton.JPG Buy Print |
The ship Cape Hobart is seen arriving Geraldton with new AHCF iron ore wagons on the deck on 9 February 2009. 1024x682 2Feb2009_CapeHobart__Geraldton.JPG Buy Print |
The ship Cape Hobart is seen arriving Geraldton with new AHCF iron ore wagons on the deck on 9 February 2009. 1024x683 2Feb2009_CapeHobart_Geraldton.JPG Buy Print |
The ship Cape Hobart is seen arriving Geraldton with new AHCF iron ore wagons on the deck on 9 February 2009. 1024x641 2Feb09_CapeHobart__Geraldton.JPG Buy Print |
The ship Cape Hobart is seen arriving Geraldton with new AHCF iron ore wagons on the deck on 9 February 2009. 1024x640 2Feb09_CapeHobart_Geraldton.JPG Buy Print |
DFZ2407/P2515 on an empty iron ore head through the Geraldton suburb of Mahomets on 21 February 2009. 1024x683 21Feb09_DFZ2407_P2515_Mahomets.JPG Buy Print |
P2506/ P2503/AB1501 haul a loaded grain train into Geraldton Port on 17 February 2009. 1078x719 17Feb09_P2506_P2503_AB1501WestEnd_Geraldton.JPG Buy Print |
DFZ2406/DFZ2404 haul an iron ore train through Narngulu on 14 February 2009. The first 10 or so wagons are new AHCF wagons delivered earlier that week pass other new AHCF wagons in the Yard. 1024x683 14Feb09__DFZ2406_DFZ2404_AHCFNarngulu.JPG Buy Print |
P2515/DFZ2407 haula a loaded iron ore train through Bringo on 14 February 2009. 1078x719 14Feb09_P2515_DFZ2407Bringo.JPG Buy Print |
A model? or the real thing DFZ2406/DFZ2404 haul an iron ore train through Bringo on 14 February 2009. 1024x683 14Feb09_DFZ2406_DFZ2404__Bringo.JPG Buy Print |
DFZ2406/DFZ2404 haul an iron ore train through Narngulu on 14 February 2009. The first 10 or so wagons are new AHCF wagons delivered earlier that week. 1078x719 14Feb09_DFZ2406_DFZ2404_AHCFNarngulu.JPG Buy Print |
DFZ2406/DFZ2404 haul an iron ore train through Bringo on 14 February 2009. 1078x719 14Feb09_DFZ2406_DFZ2404Bringo.JPG Buy Print |
New AHCF iron ore wagons stand at Narngulu on 14 February 2009. 1024x683 14Feb09_12AHCFNarngulu.JPG Buy Print |
A line of AHCF wagons after being put onto the rails at Narngulu on 10 February 2009. 1024x683 10Feb2009_AHCF_Narngulu.JPG Buy Print |
A new AHCF wagon is being prepared to be lifted onto the rails at Narngulu on 10 February 2009. 833x1250 10Feb09_AHCF_Narngulu__.JPG Buy Print |
| |