The head shunt at the south end of the Tilley loading point on 25 October 2008.
The head shunt at the south end of the Tilley loading point on 25 October 2008.
25th October 2008
Geraldton/ Midwest 2008 (Updated 31 December 2008)
RailWA @ fotopic.net
Tilley and the lead in at the South end on 25 October 2008.Previous | NextTilley siding north end points and entrance to siding on 25 October 2008.

Added on 2nd November 2008, has been viewed 91 times